Commercial Photo Gallery

19 Unit Sprinkler Loss

19 Unit Sprinkler Loss

19 unit sprinkler loss, which impacted gypsum board, insulation, carpet/padding, and laminate flooring. The property was stick built and gypcrete was used for sound. We were able demo, clean and dry the gypcrete flooring  in the 19 units within 7 days while being able to dry the common area. While the building was being occupied.

Commercial Dry Down

Commercial Dry Down

This was a clean water loss impacting a goverment building, we were able to dryout the drywall, with insulation with out any demo.